NO. | NAMA SATUAN KERJA | JUMLAH KONTRAK (Paket) | TOTAL HPS (Rp.) | TOTAL PENAWARAN (Rp.) | TOTAL NILAI KONTRAK (Rp.) | T O T A L | 0 | 0 | 0 | 0 |
---|
NO. | NAMA SATUAN KERJA | JUMLAH KONTRAK (Paket) | TOTAL HPS (Rp.) | TOTAL PENAWARAN (Rp.) | TOTAL NILAI KONTRAK (Rp.) | T O T A L | 0 | 0 | 0 | 0 |
---|