NO. | NAMA SATUAN KERJA | BARANG | KONSTRUKSI | KONSULTANSI | JASA LAINNYA | TOTAL | |||||
---|---|---|---|---|---|---|---|---|---|---|---|
Paket | HPS | Paket | HPS | Paket | HPS | Paket | HPS | Paket | HPS | ||
1. | Dinas Pekerjaan Umum & Penataan Ruang | 0 | 0 | 3 | 17.449.421.000 | 5 | 6.652.930.000 | 0 | 0 | 8 | 24.102.351.000 | T O T A L | 0 | 0 | 3 | 17.449.421.000 | 5 | 6.652.930.000 | 0 | 0 | 8 | 24.102.351.000 |
NO. | NAMA SATUAN KERJA | PAKET | PAGU | HPS | TERKOREKSI | EFISIENSI HPS | PROSENTASE |
---|---|---|---|---|---|---|---|
1. | Dinas Pekerjaan Umum & Penataan Ruang | 8 | 24.126.404.126,00 | 24.102.351.000,00 | 0 | 24.102.351.000,00 | 100,00 |
2. | Sekretariat Daerah | 1 | 1.700.000.000,00 | 675.000.000,00 | 670.000.000,00 | 5.000.000,00 | 0,74 | T O T A L | 9 | 24.777.351.000,00 | 24.777.351.000,00 | 670.000.000,00 | 24.107.351.000,00 | 97,30 |