0 Paket
Paket Terumumkan
Rp. 0,-
Pagu Terumumkan
9 Paket
Paket Selesai
Rp. 25.826.404.126,-
Pagu Selesai
PAKET TENDER (Paket) |
TENDER SELESAI (Paket) |
TENDER BELUM SELESAI (Paket) |
HPS_PAKET_(RP) | HPS PAKET TENDER SELESAI (RP.) |
NILAI PENAWARAN TERKOREKSI (RP.) |
SELISIH TENDER (Rp.) | PROSENTASE (%) |
---|---|---|---|---|---|---|---|
0 | 9 | -9 | 0 | 24.777.351.000,00 | 670.000.000,00 | 24.107.351.000,00 | 97,30 |
METODE TENDER | HPS PAKET TENDER SELESAI(RP.) |
NILAI PENAWARAN TERKOREKSI (RP.) |
PAKET TENDER (Paket) | TENDER SELESAI (Paket) |
TENDER BELUM SELESAI (Paket) |
---|---|---|---|---|---|
TENDER | 18.124.421.000,00 | 670.000.000,00 | 0 | 4 | -4 |
TENDER CEPAT | 0 | 0 | 0 | 0 | 0 |
SELEKSI | 6.652.930.000,00 | 0 | 0 | 5 | -5 |
TOTAL | 24.777.351.000,00 | 670.000.000,00 | 0 | 9 | -9 |
JENIS | HPS PAKET TENDER SELESAI(RP.) | NILAI PENAWARAN TERKOREKSI (RP.) | PAKET TENDER (Paket) | TENDER SELESAI (Paket) | TENDER BELUM SELESAI (Paket) |
---|---|---|---|---|---|
BARANG | 0 | 0 | 0 | 0 | 0 |
KONSTRUKSI | 17.449.421.000,00 | 0 | 0 | 3 | -3 |
JASA KONSULTANSI | 6.652.930.000,00 | 0 | 0 | 5 | -5 |
JASA LAINNYA | 675.000.000,00 | 670.000.000,00 | 0 | 1 | -1 |
TOTAL | 24.777.351.000,00 | 670.000.000,00 | 0 | 9 | -8 |
NO. | NAMA SATUAN KERJA | TENDER | TENDER CEPAT | SELEKSI | TOTAL | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Paket | HPS | PENAWARAN TERKOREKSI | Paket | HPS | PENAWARAN TERKOREKSI | Paket | HPS | PENAWARAN TERKOREKSI | Paket | HPS | PENAWARAN TERKOREKSI | SELISIH | ||
1. | Dinas Pekerjaan Umum & Penataan Ruang | 3 | 17.449.421.000 | 0 | 0 | 0 | 0 | 5 | 6.652.930.000 | 0 | 8 | 24.102.351.000 | 0 | 24.102.351.000 | T O T A L | 3 | 17.449.421.000 | 0 | 0 | 0 | 0 | 5 | 6.652.930.000 | 0 | 8 | 24.102.351.000 | 0 | 24.102.351.000 |